Aviation Maintenance Centre

At the Malta International Airport
Aviation Maintenance Centre
  • Project Type
    Building
  • Value
    5 million
  • Services
    Design + Engineering + Management
  • Start Date
    2015
  • End Date
    2017

This project involved a 2,400 square meter extension to the existing Maintenance facility at the Malta International Airport allowing work to be carried out on three aircrafts simultaneously.